By the end of 2022 Germany will have no nuclear power plants remaining. I have covered why this policy is folly elsewhere, so won’t cover it again here. Instead let us consider in a little detail how things will pan out in the next decade. To put the numbers in perspective I will estimate how much solar power will need to be added to replace the lost production due to each reactor being closed early (assuming a solar panel life span of 25 years and capacity factor of 10%). I’m using solar, not wind because the load factor for wind farms will be quite dependent on how much offshore wind is built, but if you want onshore wind figures just divide by 2.5.
Here’s the timetable of future reactor shutdowns:
2015: 1 reactor closes
Reactor: Grafenrheinfeld, (1.3 GW)
Average load factor: 85.8%
Original shut down date: 2028
Solar required to replace lost production: 6.8 GW
2017: 1 reactor closes
Reactor: Gundremmingen-B (1.3 GW)
Average load factor: 83.6%
Original shut down date: 2030
Solar required to replace lost production: 6.8 GW
2019: 1 reactor closes
Reactor: Phillipsburg-2 (1.4 GW)
Average load factor: 88.3%
Original shut down date: 2032
Solar required to replace lost production: 7.3 GW
2021: 3 reactors close
Reactor: Gundremmingen-C (1.4 GW)
Average load factor: 88.3%
Original shut down date: 2030
Solar required to replace lost production: 5 GW
Reactor: Brokdorf (1.4 GW)
Average load factor: 88.2%
Original shut down date: 2033
Solar required to replace lost production: 6.7 GW
Reactor: Grohnde (1.4 GW)
Average load factor: 90.4%
Original shut down date: 2031
Solar required to replace lost production: 5.6 GW
2022: 3 reactors close
Reactor: Isar-2 (1.4 GW)
Average load factor: 89.5%
Original shut down date: 2034
Solar required to replace lost production: 6.7 GW
Reactor: Emsland (1.3 GW)
Average load factor: 93.5%
Original shut down date: 2035
Solar required to replace lost production: 6.8 GW
Reactor: Neckarwestheim-2 (1.3 GW)
Average load factor: 92.3%
Original shut down date: 2036
Solar required to replace lost production: 7.3 GW